• Hauptbild
  • Piktogramme
  • Hauptbild
  • Piktogramme

Order Number: Please select a variant

House in-feed with main shut-off device PS 5 bar

Short description
  • For installation in liquefied petrochemical plants for ground-level house systems
  • Incl. ball valve with TAE and wall connection set inside
  • RST22: Incl. heat-shrink tubing (length: 500 mm)
Order Number: Please select a variant